In 2017, Bane NOR built 120 meters of new snow structures on the high mountains just west of Hallingskeid in Norway.
The project consisted of tearing down old wooden buildings and setting up new ones in steel.
Mesta AS, Special production did the assembly.
Pretec AS has delivered 46 pcs. BB tension rods in M24. Special with these tension rods, is the surface treatment itself, supplied with 100μ Hempadur Mastic 4588W and 60μ Hempathane HS 55610, in colour specified by customer.