Storberget project

NCC have the general contract for the 5,6km long section between Eidanger and Ønna, which is a part of the new high-speed railroad with double tracks stretching from Larvik to Porsgrunn. A total of 9,5km tunnel is driven in the project.

Our deliveries throughout the project, from 2012 to 2016, have been products for rock support and frost and water proofing, including 42 000 safety bolts.

Pretec AS
NO 980 429 245 MVA
Phone: (+47) 69 10 24 60
E-mail: post@pretec.no

Office/warehouse

Kampenesmosen 3
N-1739 Borgenhaugen

Postal adress

Postboks 102
N-1740 Borgenhaugen